How to build a timber privacy screen for an outdoor area
This guide covers a freestanding timber privacy screen measuring approximately 2400 mm wide × 1800 mm high, with horizontal slats and three posts. It is designed as a practical DIY project, but the posts and footings must be checked for local wind, soil and site conditions before construction.
Quick answer
Build a timber privacy screen by checking approvals and underground services, setting posts in site-designed footings, allowing concrete to gain the specified strength, then fixing evenly spaced exterior timber slats. For a 2400 mm-wide screen, 22 slats measuring 70 mm wide with 10 mm gaps form a 1750 mm-high panel.
- Skill level
- ⏱️ Skill Level: Intermediate
- Time
- 2 working days, plus concrete curing time. A beginner with basic carpentry skills can complete the work with a helper and appropriate footing advice.
- Trade
- Carpentry & Joinery
- Updated
- 14 November 2026
Tools you will need
- Post
- Spirit level, at least 1200 mm long, and tape measure
- Circular saw or mitre saw, with a sharp timber
- Stringline, clamps and shovel
- Concrete
🪚 How to Build a Timber Privacy Screen
How do you build a freestanding timber privacy screen?
This guide covers a freestanding timber privacy screen measuring approximately 2400 mm wide × 1800 mm high, with horizontal slats and three posts. It is designed as a practical DIY project, but the posts and footings must be checked for local wind, soil and site conditions before construction.
The example uses 70 × 19 mm hardwood slats with 10 mm gaps. You can adjust the appearance, but do not assume the same post and footing details will suit a larger or more exposed screen.
What skills and time do you need to build a timber privacy screen?
⏱️ Skill Level: Intermediate — approximately 2 working days, plus concrete curing time. A beginner with basic carpentry skills can complete the work with a helper and appropriate footing advice.
What tools do you need to build a timber privacy screen?
What timber, posts and fixings do you need for an outdoor privacy screen?
🪵 Materials
For the 2400 × 1800 mm example:
💡 Pro tip: Footing dimensions above are for estimating only, not a universal design. Wind exposure, soil, screen porosity and local requirements can substantially change the footing and post sizes.
Safety Requirements
⚠️ Safety
Step-by-Step Guide
Step 1: 1️⃣ Plan the position and layout
Mark out the screen at 2400 mm wide and 1800 mm above finished ground level. Confirm the boundary, underground services, clearance to structures and any required approvals.
For this example, the outside faces of the two end posts align with the ends of the 2400 mm slats. Centre the third post between them. Check the chosen position provides the desired privacy without blocking access or creating a drainage problem.
💡 Pro tip: Temporarily mark the screen outline with stakes and string. View it from both the outdoor area and neighbouring sightlines before committing to the holes.
Step 2: 2️⃣ Confirm the post and footing design
Arrange for the post size, footing diameter, depth and embedment to be assessed for the site. A privacy screen can attract substantial wind load, even when gaps are present between slats.
Use the 90 × 90 mm H4 posts and indicative footing dimensions in this guide only if they are confirmed as suitable. Check the design specifies how the posts are positioned in the concrete, including any required bottom cover.
Step 3: 3️⃣ Set out and dig the holes
Run a stringline along the intended post line. Mark the two end-post positions and the centre post, then excavate the holes to the approved diameter and depth.
Keep the hole bottoms on firm, undisturbed ground unless the footing design specifies otherwise. Remove loose spoil and confirm each hole is correctly positioned before placing the posts.
Step 4: 4️⃣ Install and brace the posts
Place each post in its footing according to the approved detail. Set the outside faces of the end posts 2400 mm apart, with the centre post midway between them.
Check that:
Brace the posts securely so they cannot move during the pour.
Step 5: 5️⃣ Concrete the posts
Mix and place the concrete to the product instructions and footing design. Compact it carefully around each post without disturbing the alignment.
Finish the concrete at the top so water drains away from the timber. Recheck the post positions and plumb while the concrete is still workable.
Leave the braces in place and allow the concrete to cure as directed by the concrete manufacturer and footing designer before installing the slats or exposing the screen to load. Concrete generally develops its specified strength over approximately 28 days; do not assume it is ready for full loading immediately.
Step 6: 6️⃣ Prepare the slats
Check the 22 slats for straightness, damage and consistent length. Cut them to 2400 mm if required, then lightly sand sharp edges and remove machining dust.
Apply the selected exterior coating to all faces and cut ends as directed by the coating manufacturer. Some hardwoods require weathering or preparation before coating—follow the specific product instructions.
💡 Pro tip: Coat the backs and ends before installation, while they are easy to reach. Merbau can release tannins that stain adjacent paving and finishes, particularly when new.
Step 7: 7️⃣ Mark the slat positions
Starting 50 mm above finished ground level, mark the position of the bottom slat. For the example layout, install 22 slats at 70 mm high with 21 gaps of 10 mm:
With the bottom slat 50 mm above ground, the top of the upper slat aligns with the 1800 mm post height. Check actual timber widths before fixing and adjust the layout if required.
Step 8: 8️⃣ Fix the slats
Clamp the bottom slat across the front faces of the posts and check it is level. Predrill the hardwood and fix it to each post with two stainless-steel screws per post, keeping the fixings appropriately spaced from the slat edges and ends.
Use 10 mm spacers between slats and work upwards. Check level regularly rather than relying on the spacers alone. The centre post supports each slat and helps reduce movement.
Step 9: 9️⃣ Inspect and finish
Remove the temporary braces once the concrete has cured sufficiently. Check every fixing, trim or finish post tops as appropriate, and apply any remaining coating in accordance with the manufacturer’s directions.
Clean the area and dispose of offcuts and treated-timber waste according to local requirements. Do not burn treated timber.
Common Mistakes to Avoid
Pro Tips
💡 Use a pair of identical 10 mm spacers to keep gaps consistent, but check the slats with a level as you progress.
💡 Predrill hardwood slats to reduce splitting, especially near the ends.
💡 Choose straight, dry slats and store them flat before installation to reduce distortion.
💡 Inspect the coating and fixings annually, and maintain the finish according to the product manufacturer’s recommendations.
Recommended Tools
🔧 Recommended Tools
Frequently asked questions
- What is involved in build a timber privacy screen for an outdoor area?
- This guide covers a freestanding timber privacy screen measuring approximately 2400 mm wide × 1800 mm high, with horizontal slats and three posts. It is designed as a practical DIY project, but the posts and footings must be checked for local wind, soil and site conditions before construction.
- What skill level do I need for build a timber privacy screen for an outdoor area?
- ⏱️ Skill Level: Intermediate — approximately 2 working days, plus concrete curing time. A beginner with basic carpentry skills can complete the work with a helper and appropriate footing advice.
- What are common mistakes when build a timber privacy screen for an outdoor area?
- 1. Undersizing the footings: A screen can act as a sail in strong winds. Use a site-appropriate design. 2. Skipping service checks: Underground power, gas, water and communications may be present even in established gardens. 3. Fixing slats before the concrete is ready: Movement can leave posts out of plumb or compromise the footing. 4. Using unsuitable fixings: Ordinary indoor scr
- What tools do I need for build a timber privacy screen for an outdoor area?
- This guide includes a comprehensive tools list. Key carpentry & joinery tools are detailed in the Tools Required section.
- What Australian Standards apply to a timber privacy screen?
- Relevant Australian Standards include AS/NZS 1170.2:2021 for wind actions, AS 1720.1:2010 for timber structural design and AS/NZS 1604.1:2021 for preservative-treated timber. They address different aspects of the work rather than providing one universal privacy-screen design. Confirm applicable editions, amendments, approval conditions and site-specific design requirements with the relevant building authority or designer.
- How deep should timber privacy screen posts be?
- Timber privacy screen posts need an embedment depth and footing size determined for the screen height, wind exposure, soil and structural arrangement. There is no single safe depth for every Australian site. The example’s 2700 mm posts do not establish an approved embedment depth; obtain suitable footing details before ordering posts or excavating.
- Do you need council approval for a timber privacy screen in Australia?
- A timber privacy screen may need planning or building approval, depending on the state or territory, council, location, height and construction. A height of 1800 mm does not automatically make a screen exempt nationwide. Check the relevant approval pathway before construction, particularly near boundaries, swimming pools, easements, heritage places or bushfire-prone land.
- How many timber slats do you need for an 1800 mm privacy screen?
- Twenty-two slats measuring 70 mm wide, separated by twenty-one 10 mm gaps, form a 1750 mm-high slatted panel. An overall height of 1800 mm therefore leaves 50 mm for clearance or another specified allowance. Set out the actual timber dimensions before fixing, and distinguish overall screen height from the height of the slatted panel.
- What checks are needed before digging privacy screen post holes?
- Check underground service information and establish service locations before digging privacy screen post holes. Before You Dig Australia supplies information from participating asset owners, but plans alone do not confirm exact positions or cover every private service. Follow asset-owner instructions, use competent locating assistance where needed, and assess safe excavation methods before using an auger.
Written by Chippy, the Carpentry & Joinery specialist at NSW.Tools.